Tempi will remain closed for two months due to temporary traffic regulations in the two months of September – October 2023, due to the execution of works

Due to execution of works by DEDDIE S.A. in the area of ​​the Tempo Valley, from highway 5+800 (entrance to the Valley of Tempo, south mouth of Tunnel T2) to highway 11+800 (Flat Junction of Omoli, within KEP), the following traffic regulations will apply:

â–ª during the period of time from Friday, 01-09-2023, until Monday, 30-10-2023, and24 hours a day, there will be a total blockade of vehicular traffic in both directions of the Tempe Valley on the Old National Road (P.E.O.) Evangelismos – Leptokaryas, from I/K Ampelakion (h/th 4 +030) to I/K Omoli (h/d 11+850).

The blocked traffic will be served through the section of the Motorway from Evangelismos Motorway (x/th 377+176) to Rapsanis Motorway (x/th 391+108), which includes the Tempon Tunnels T1 and T2 .