Traffic in Galatsi: All changes from today until Christmas due to work on the metro

by

Until December 25, traffic regulations will be in effect in Galatsi due to construction work on Metro line 4

Traffic regulations are in effect from today until December 25 in Galatsi due to construction work on Metro line 4.

In detail, the traffic regulations that will be applied:

PHASE 1

  • The gradual reduction of the width of the minimum width of the roadway of approximately 3.50 m. of Galatsiou Street and for a length of approximately 150.00 m. before its junction with Veikou Street / Ag. Glykerias with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Protopapadakis Street.
  • The gradual restriction of the width of the minimum width of the roadway of approximately 3.50 m on Galatsiou Street and for a length of approximately 15.00 m after its junction with Veikou Street / Ag. Glykerias with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Athens.
  • The gradual limitation of the width of the road surface of approximately 3.50 m. minimum width of Protopapadakis L. and for a length of approximately 150.00 m. after its junction with V. Veikou / Ag. Glykerias with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Psychiko.
  • The gradual reduction of the width of the roadway of a minimum width of approximately 3.50 m on V. Veikou from the height of Artemisos Street to the height of Heras Street by occupying the right part of the roadway in the direction of movement of vehicles in the traffic flow towards V. Galatsiou/ L. Protopapadakis.
  • The gradual limitation of the width of the roadway to a minimum width of approximately 4.50 m. of St. Glykerias and for a length of approximately 30.00 m. after its junction with Galatsiou St. / Protopapadaki St. with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Kypseli.
  • The gradual limitation of the width of the road surface of approximately 3.25 m. minimum width of Ippokratous Street from the height of Ag. Glykerias until its junction with Lysiou Street, occupying the right part of the roadway in the direction of traffic.
  • The total blockade of Lysiou Street with the exception of the use by passers-by and emergency vehicles from Galatsiou Street to Ippokratous Street.
  • The complete blockade of Artemisos Street with the exception of the use by passers-by and emergency vehicles from Veikou Street to Bouboulinas Street.
  • The total blockade of Ekatis Street with the exception of the use by passers-by and emergency vehicles and for a length of approximately 20.0 m before and up to Veikou Street.
  • The characterization of Ekatis Street as a cul-de-sac and in its section from the construction site occupation to Bouboulinas Street.

PHASE 2

  • The gradual limitation of the width of the road surface of approximately 3.50 m. minimum width of Protopapadakis L. and for a length of approximately 150.00 m. after its junction with V. Veikou / Ag. Glykerias with occupation of the left part of the roadway in the direction of movement of vehicles in the traffic flow towards Psychiko.
  • The gradual reduction of the width of the roadway of a minimum width of approximately 6.00 m. of Veikou Street from the height of Artemisos Street to the height of Heras Street approximately by occupying the left part of the roadway in the direction of movement of vehicles in the traffic flow towards L. Galatsiou/ L. Protopapadakis.
  • The gradual limitation of the width of the road surface of a minimum width of approximately 3.50 m. on Hippokratous Street and for a length of approximately 70.0 m. after its junction with Ag. Glykerias with occupation of the left part of the roadway in the direction of movement of vehicles.
  • The gradual limitation of the width of the roadway of a minimum width of approximately 3.50 m. on Profiti Ilias Street and for a length of approximately 50.0 m. after its junction with Venizelou Street by occupying the left part of the roadway in the direction of movement of vehicles.
  • The gradual reduction of the width of the road surface of approximately 3.50 m. of the minimum width of Venizelou Street from the height of Profiti Ilias Street to the height of Ag. Glykerias with occupation of the right part of the road surface in the direction of movement of vehicles in the traffic flow towards Ag. Glykerias.
  • The determination of the maximum speed limit at 30 km/h for vehicles moving on Venizelou Street and in the part thereof determined from approximately 50 m before the start of the construction site occupation and until its end.
  • The prohibition of overtaking for vehicles moving on Venizelou Street and in the part of it determined from approximately 50 m before the start of the construction site occupation and until its end.
  • Prohibition of stopping and parking of vehicles on Profiti Ilias Street on the right side of the roadway, in the direction of movement of vehicles.

PHASE 3

  • The gradual blocking of the traffic flow of St. Ag. Glykerias in the direction of Galatsiou Street/ Protopapadaki Street in the section from Ippokratous and up to its junction with Galatsiou Street/ Protopapadaki Street.
  • The gradual limitation of the width of the roadway to a minimum width of approximately 6.00 m on Galatsiou Street and for a length of approximately 50.00 m before its junction with Veikou Street / Ag. Glykerias with the occupation of the left part of the roadway in the direction of movement of vehicles in the traffic flow towards Protopapadakis Street.
  • The gradual restriction of the width of the minimum width of the roadway of approximately 4.00 m on Galatsiou Street and for a length of approximately 20.00 m after its junction with Veikou Street / Ag. Glykerias with occupation of the left part of the roadway in the direction of movement of vehicles in the traffic flow towards Athens.
  • The total blockade of the side street of Protopapadakis Street from Profiti Ilias Street to Ag. Glykerias.
  • The characterization of the street Ag. Glykerias from Galatsiou Street/ Protopapadaki Street to and from El. Venizelou.

PHASE 4

  • The gradual blocking of the traffic flow of St. Ag. Glykerias in the direction of El Street. Venizelou and for a length of approximately 30.00 m. after its junction with Galatsiou Street/ Protopapadaki Street.
  • The gradual limitation of the width of the minimum width of the roadway of approximately 6.00 m. of Galatsiou Street and for a length of approximately 60.00 m. before and until its junction with Ag. Glykerias/ Veikou Street with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Protopapadakis Street.
  • The characterization of the street Ag. Glykerias from El. Venizelou to and to Galatsiou Street/ Protopapadaki Street.
  • The prohibition of the right turn from L. Galatsiou towards Ag. Glykerias.

PHASE 5

  • The gradual reduction of the width of the roadway to a minimum width of approximately 3.50 m on Protopapadaki St. and for a length of approximately 80.00 m after its junction with Veikou St. / Ag. Glykerias with occupation of the right part of the roadway in the direction of movement of vehicles in the traffic flow towards Psychiko.

PHASES 1,2,3,4,5

  • The determination of the maximum speed limit at 50 km/h for vehicles moving at the junction L. Veikou/Ag. Glykerias – L. Galatsiou/ Protopapadaki and in the part of it determined from 300 m. to approximately 100 m. before the start of the construction site occupation.
  • The determination of the maximum speed limit at 30 km/h for vehicles moving at the junction L. Veikou/Ag. Glykerias – L. Galatsiou/ Protopapadaki and in the part of it determined from approximately 100 m. before the start of construction site occupation and until its end.
  • The prohibition of overtaking for vehicles moving at the junction L. Veikou/Ag. Glykerias – L. Galatsiou/ Protopapadaki and in the part of it determined from approximately 300 m. before the start of construction site occupation and until its end.
  • The prohibition of stopping and parking of vehicles on Galatsiou/ Protopapadaki Street on the right side of the roadway, in the direction of movement of vehicles in the area of ​​the works in the traffic flow towards Psychiko and on Veikou Street on the right side of the roadway , in the direction of movement of vehicles in the area of ​​the works in the traffic flow towards Ag. Glykerias.

Drivers of vehicles are requested to be especially careful when passing through the work sites and to follow the existing road markings.

You May Also Like

Recommended for you