The indoor stadium of OAKA will be able to host anyone who needs it in a heated room, as stated on his personal Facebook account the Coordinating General Manager of the Olympic facilities, Konstantinos Halioris.
Alongside, came down from the roof of the stadium the “cube” so as to unload the roof.
Analytically:
“From the first moment we were informed about the dangerous weather phenomena that would affect Attica and the OAKA region, the services of the organization responded to the maximum.
Branches were cut as a precaution, at a great height, wells were cleaned and the athletes, the users of the spaces and the citizens were informed about the safe driving and the traffic of the pedestrians in the surrounding area of ​​OAKA.
In collaboration with KAE PAO Today’s match between KAE PAO and KAE Iraklis was postponed, the electronic roof panel (CUBE) that rests on the closed roof and weighs over 8 tons was lowered, in order to unload the roof due to the continuous snowfall.
At the gate of the sponsors’ parking lot, there is a large amount of salt available to the Region and the surrounding municipalities.
There is also the possibility of hosting in a heated room for anyone in need.
For the little, four-legged friends of the center, food was placed in the special areas that have been created.
After the visit of “Elpida”, an inspection will be carried out throughout the Olympic Complex in order to record and repair any damage caused by the snow.
I thank the employees of OAKA who once again, in perfect cooperation, showed that the Organization operates in all conditions “.
Follow News Bulletin 247 on Google News to be the first to hear the latest news .
I am currently a news writer for News Bulletin247 where I mostly cover sports news. I have always been interested in writing and it is something I am very passionate about. In my spare time, I enjoy reading and spending time with my family and friends.